Permits
Summit Fire & EMS issues permits in conjunction with the community development departments of Summit County and the towns of Frisco and Silverthorne. The Summit Fire & EMS Fire Protection District covers Summit County north of Farmer's Korner/Summit High School to the Grand County line, and from the Eisenhower Tunnel to Vail Pass, including Montezuma, Heeney, Copper Mountain, Dillon and Keystone.
Summit Fire & EMS Fee Schedule
International Fire Code as adopted by Summit Fire & EMS
Additional codes and policies:
- Current edition of: NFPA 13, 13R, 13D (building fire sprinklers)
- Current edition of: NFPA 72 (fire alarms)
- Summit Fire & EMS Life Safety Policy
Permits from Summit Fire & EMS are required for the following projects:
- New residential construction and additions
- Sprinklers and monitored alarms
- Commercial construction, including tenant finish and remodels
- Change of use in business establishments
- Tents and special events
- Food trucks
- Backyard campfires
- Pile burns
Click here for pre-application checklists.
Refer to our Business Resource List, as that may be able to assist you in obtaining items needed for compliance with your inspections.
- Inspections should be requested at least two business days in advance and can be requested by clicking on the "Inspection Request' box above or by calling the Summit Fire & EMS inspection-request line at (970) 262-5215. Any other informal requests may not be honored.
- Each permitted contractor must request inspections of that contractor’s specific work.
- Fire sprinkler and alarm final inspections shall be coordinated and scheduled for the same time.
- Any incomplete inspections will be subject to a reinspection fee.
- Cancellation of scheduled inspections within 24 hours may be subject to a reinspection fee.
- Any contractor requesting an inspection must provide the necessary testing supplies.
- No work shall be performed without an approved set of plans.
- All fire-system piping and wiring must be visible for a proper inspection.
- Certification letters are required before any system receives final approval.
- Application requirements include one digital copy, submitted as a .pdf file with the permit application.
- Minimum acceptable scale is 1/8 inch to the foot.
- Name, complete address, and telephone number of owner representative and installing contractor shall be furnished with drawings.
- Name, physical and mailing address of project shall be furnished with drawings.
- Contractor’s license classification and number shall be stamped on drawings.
- Equipment data sheets for each device must be submitted with applicable information highlighted.
- All symbols should adhere to NFPA 170.
- Ceiling heights and ceiling detail shall be shown.
- Square footage shall be shown.
- Any missing or inaccurate information may lead to the rejection of the plans and a resubmittal fee may be charged.